Catching Up

6/8/2011

2 Comments

 
I took a night off yesterday, but we were at the house today at lunchtime and no one was working - so I think I have a good sense of what happened yesterday (although no pictures -- sorry).Looks like all the 220V lines are in, which means our transformer is going to be placed on one of the poles close to the back, right corner of the house (yaay!) We also have to double-check on the lines they used for the pool stub out, but right now it's #6-3 (engineers - can that handle more or less pumps/filters/etc than #8?)

Also, some of the insulation is in, and so far it's all correct (R19 in the exterior walls, R13 interior, none in the ceiling yet, but that will be blown R30).

Finally, ALL of the sheet rock has been delivered! It's in stacks all over the house! So tonight we'll have to check the fixes from the engineer & inspector's checklists, since the walls are going to be closed in very soon. We're also expecting septic and stucco to begin ASAP.

Finally, we got the pool location signed off on, and should be doing the second pool site visit late next week.
2 Comments
Software Reviews link
10/24/2013 06:17:31 am

Found this link while searching Google, thanks

Reply
Raannt link
9/27/2023 08:59:54 pm

Great rreading your blog

Reply



Leave a Reply.

    About

    Everything you want to know (and then some) about our new home at 7715 Trailside Estates Blvd.

    Archives

    October 2011
    September 2011
    August 2011
    July 2011
    June 2011
    May 2011
    April 2011
    March 2011

    RSS Feed

Powered by Create your own unique website with customizable templates.