We had our pool design meeting today, it went very well, and soon we'll be having a pre-construction meeting with them to pick all our options! We also have our framing inspection and pre-drywall meeting on Friday morning, and tomorrow or Thursday I'm supposed to take a "slow video" of everything in the wall so that we can find the studs etc after the sheet rock goes in.
There are a couple of interesting looking boxes inside the house with light fittings and fixtures, we couldn't really get decent pictures of them (I had to use my phone - the camera battery was exhausted again), but it looks like the electrical is almost done. We had our pool design meeting today, it went very well, and soon we'll be having a pre-construction meeting with them to pick all our options! We also have our framing inspection and pre-drywall meeting on Friday morning, and tomorrow or Thursday I'm supposed to take a "slow video" of everything in the wall so that we can find the studs etc after the sheet rock goes in.
4 Comments
Tammy
6/1/2011 02:08:06 am
No wirings housed in pipes? Okay.... lol
Reply
Saroj
6/1/2011 02:22:24 pm
The wires in the walls will be in conduits (at least some of them will be - and they'll even leave some conduit in there so we can run our own wires through them later), but in the attics here, they don't bother, since you can walk around in there and find them.
Reply
Tammy
6/2/2011 12:15:26 am
Oh ok, so what you are saying is that the attic is not going to be a secret room for Henrik then? :-P
Reply
Saroj
6/2/2011 12:35:17 am
Nope, I know it's complicated, so here's the run down: the understair closet is going to be a secret room (for H or anyone else).