They're framing out the foundation, building the plywood form that the concrete will be poured into. This means that soon the engineer and inspector will be out there (us too!) to make sure all is well before they pour. I'm thinking by the end of next week, we'll possibly actually have a slab, believe it or not. Keep in mind this is 9 days in. I'm impressed.
When we got there they were still on site (about 6PM), which is always a little uncomfortable for me, especially since I'm taking pictures. We noticed the backhoe/front end loader and bobcat are both parked away from the action right now, which made me wonder out loud if they leave them there on the weekends :) The pics are probably not as high quality tonight though, as our camera informed me its batteries were "exhausted" when I turned it on at the lot, so I had to resort to my phone. Take a look and see, they're so small here that you may not even notice...