Sadly, I don't have a picture of it (yet), but here are a few of the "before" pictures, taken this morning, and a run-down of everything that happened to get us to this point.
They're still saying they'll be finished in July, but we know better! We're hopeful that we'll move before the end of the year.



In that time, we selected a builder and a lender (signed a contract with the builder and loan application for both interim/construction and permanent/mortgage loans in December 2010), and customized the floor plan we wanted. We also did all our design selections (working with a wonderful designer), and selected a pool company to build the small pool we're also constructing. At this point, we have building, septic, and HOA/ACC approvals, and have made contact (well, our builder has) with all the utility companies that we'll need to deal with (just electricity and water - there's no gas or sewer in our neighborhood). So after all that "pre-construction" work, we're super excited to begin, and can't wait to see how it all turns out!